  • Location: Serbia
  • Year: 2018

Project Description

The problem

We are in Kovin, Serbia. In this small town on the Danube, not far from Belgrade, there is a coal tailing pond.

So far, the solid material (coal residue) accumulated in the pond has always been transferred to the treatment plant using dumpers. An expensive and not very sustainable procedure!

The solution

The solution proposed by DRAGFLOW is much cheaper and effective. 

One of our hydraulic pumps (model HY50/108) has been mounted on an excavator boom to collect the compact material. This pump can guarantee a delivery distance of up to 800 m: the ideal solution to make dumper use superfluous.

Another efficient operation performed by our flexible pumps!