Case Histories

Share This:

Project Details

  • Location: Sicilia
  • Year: 2006

Project Description

ENI project: Dirillo reservoir dredging - Sicily - Italy.

High depth dredging project - Pressure compensated Dragflow equipments

Features:

  • easy assembling by pins.
  • quick power pack start-up by oil hoses fast connections.
  • HY300 dredging pump coupled with EXHY35 excavators.
  • moving by winches (propeller on request).
  • 40 m dredging depth.
  • fuel consumption: 80 litres per hour.
  • delivery distance 800-900 m.
  • solid production: 300 m3/h.
  • task performed in 4 months.

Dragflow: Mastering high depth dredging and deep sea mining