Case Histories

Share This:

Project Details

  • Location: Nigeria
  • Year: 2008

Project Description

Full optional Dredge

Application: Port dredging

Dredging Unit: Dragflow Pump HY300B with 2 excavators
Capacity: 900/1200 m3/h                                                              
Head: 18/28 m


Related products