Case Histories

Share This:

Project Details

  • Location: Indonesia
  • Year: 2011

Project Description

Working context

Mine collection pond dredging

The problem

Increase the mine pond capacity. The customer, who already had an excavator, had to increase the mine pond capacity removing the sand. Customer was looking for a dredging solution which was able to modify the flow during loading trucks in order to save time and contain operating cost.

 

Our Solution

Dragflow HY400B with two dredging cutters EXHY35 directly mounted and driven by the excavator. Discharge distance of about 900m.