Project Details

  • Location: Georgia
  • Year: 2011

Project Description

Working context

The project consiste in the widening and cleaning of a commercial harbor in Georgia

The Problem

Find a very flexible equipment able to work with working depth up to 15m and discharge distance from 200mm and 600m

 

Our Solution

Dragflow Dredge DRH85/160E22DF: a full optional dredge with 2 dredging unit. The first dredging unit on bord of the dredge to work in the main area of the new harbor and a second unit, mounted on an excavator, to work on the shore.