Case Histories

Gold Mine Tailing dredging

Share This:

Project Details

  • Location: Turkey
  • Year: 2104

Project Description

Turkey: gold mine tailing reclamation

Remore controlled mini dredge, working depth 20m, production 60m3/h with up to 50% solid concentration. Protection for lower rubber liner. 

 

Dredge serie DRP12,5SS. Control system with double inverter to allow operator to control the dredge with only 1 finger. From remote control the operator can monitor working depth and pump load.

 

Dredging with Dragflow, easy, safe and efficient!


Videos